Dilzu tail lift professional engineers come to the site nationwide and complete the installation and commissioning of the tail plate in 3 hours.

2025-05-14 Views: 4 +

Dilzu tail lift professional engineers come to the site nationwide and complete the installation and commissioning of the tail plate in 3 hours.

Tail lift rapid installation service, Dilzu tail lift engineers come to the site within 3 hours nationwide, standardized loading and unloading solutions

1、 Establishing a standardized service system to create industry benchmarks

As the first domestic brand to pass the GB/T37706 "Technical Requirements for Installation and Use of Vehicle Crane Tail Plates" certification, Dilzu tail lift has launched the "Rapid Installation Plan":

326 cities nationwide covered, engineers respond within 30 minutes

Standardized process for 3-hour delivery (including equipment debugging and operation training)

Automatically generate electronic files after installation, free lifelong query

The 2024 evaluation of the cold chain logistics industry shows that the installation efficiency of Dilzu tail lift engineering team is 57% ahead of the industry average.

2、 Five dimensional engineer qualification guarantee

Each on-site engineer has passed triple certification:

Operation qualification: Hold a special equipment installation license (TSG Z0004-2007)

Technical certification: completed 200+hours of practical training and VR fault simulation assessment

Service specification: carry out 17 standardized service actions (including shoe cover wearing, tool disinfection and sterilization, etc.)

The team has created a unique '3D surveying method':

Laser rangefinder scanning cargo compartment structure (accuracy ± 0.5mm)

Intelligent diagnosis system for battery voltage

Predicting installation risks of road slope sensors

3、 Full scenario installation solution

Provide customized services for different car models:

4.2-meter urban distribution truck

Steel plate reinforcement scheme matches vehicle load capacity

Folding tailboard storage thickness is only 15cm, avoiding height restrictions on road sections

Cold chain transport vehicle

Low temperature environment specific hydraulic oil (normal operation at -40 ℃)

Anti condensation tools are used throughout the installation process

▍ Event transport vehicles

WRC event level installation standards

Control of loading and unloading error of 2-ton racing car ± 1.5mm

4、 Digital after-sales service network

Users can achieve:

One click repair report (door-to-door service within 4 hours in 98% of regions nationwide)

Real time monitoring of hydraulic oil volume (accuracy up to ± 2ml)

Remote OTA firmware upgrade 7

According to a third-party survey conducted in 2024, the satisfaction rate of after-sales service for Dilzu tail lift reached 98.7%, and the average time for fault repair was 2.3 hours.

Tags: Tail lift installation service Dilzu tail lift truck tail lift debugging nationwide on-site installation special equipment installation qualification

Article:Dilzu tail lift professional engineers come to the site nationwide and complete the installation and commissioning of the tail plate in 3 hours.

Url:http://www.dilzutaillift.com/douyin/topbeam-tailgate-installation-3hour-nationwide-engineers.html

Online
Feedback
Inquiry
Scan

Scan
Add Follow Consultation

China Free Hotline
400-0533-331

TOP